Recent Projects

Below is a brief overview of some recent projects DeFalco Construction Company is currently working or has completed. Please contact us for more information about these projects or other projects we are working on.

Lefthand Creek Repairs from 2013 Flood

Owner: City of Longmont
Location: Longmont, CO

Work: Repair project for the flood damage along Lefthand Creek between Hover St. and the St. Vrain River. Work included erosion control, creek bank repair and stabilization, removal of sediment and debris, sidewalk repairs, and irrigation/landscape repairs.

 

Left Hand Creek Restoration - After
Left Hand Creek Restoration – After

 

Left Hand Creek Restoration - Before
Left Hand Creek Restoration – Before

Lefthand Creek Flood Control Project

Owner: City of Longmont
Location: Longmont, CO

Left Hand Creek Flood Control project

Work:  This large project encompasses every phase of construction DeFalco Construction performs including demolition, utility relocations, channel improvements, box culvert & bridge construction, and street construction.  Improvements were completed prior to the 2013 floods and helped save many homes and infrastructure from further damage.

Left Hand Creek 097

County Line Road – Phase 2b

Owner: City of Longmont
Location: Longmont, CO

Work:  Project consists of storm drainage improvements, waterline improvements, excavation/ grading, curb, gutter and sidewalks and complete street re-construction to widen approximately 1 mile stretch of E. County Line Road.

Coal Creek Crossing Replacement

Owner: Town of Erie
Location: Erie, CO

 

Coal Creek Crossing Replacement
Coal Creek Crossing Replacement

Work:  Construction of new Airport access pavement over Coal Creek including installation of 16′ x 10′ and 12′ x 9′ concrete box culverts, grouted boulders, soil riprap, earthwork and removal of the existing creek crossing structures.

Coal Creek Crossing Pre-Construction
Coal Creek Crossing Pre-Construction

1st Street Widening at Monroe Ave. & 1st Street Storm Drainage Improvements

Owner: City of Loveland, CO
Location: Loveland, CO

Work: This project involves clearing & grubbing, earthwork, subgrade preparation and stabilization, removal and installation of curb, gutter and sidewalk, asphalt paving, and pavement marking for street widening and construction of two parking lots.  The project also includes installation of 18″ diameter RCP storm drainage improvements.

Coal Creek Trail – Erie

Owner: Town of Erie
Location: Erie, CO

Coal Creek Trail Erie -3

Work: Construction of 8 foot wide concrete and 4 foot wide crusher fines trail. Trail construction also includes 12,700 cubic yards of excavation and construction of a soil nail wall under the WCR 8 bridge.

Coal Creek Trail Blading - Erie

Coal Creek Trail - Erie - 2

Coal Creek Trail Restorations – Lafayette

Owner: Town of Lafayette
Location: Lafayette, CO

Coal Creek Trail Restoration 2014-10-17
Coal Creek Trail Restoration 2014-10-17

Work:  Repair of to City of Lafayette trail system along Coal Creek from the 2013 Floods as well as a new trail head parking lot.  Work included bike path repairs, boulder walls, and creek bank repair and stabilization.